ALBERT FIELDS BRUNSWICK
Architect: Fieldwork Interior Architect: Breathe Builder: Mirvac Constructions (VIC)
PLANNED OPENING - LATE 2025
* Artist's Impression

About LIV Albert Fields

LIV Albert Fields is Mirvac's third Build-to-Rent property in Melbourne, located in Brunswick, approximately 6km north of the Melbourne CBD.

Ranging over two buildings that are 8 and 11 levels, LIV Albert Fields will offer 498 residences with a mix of studios, one, two and three-bedroom apartments. The project will feature over 2,200sqm of residential amenity including a dedicated health and wellness facility, co-working, workshop, pet wash, communal laundry, private dining, multi-purpose spaces, rooftop terraces, and many more amenities.

Designed by Fieldwork, Breathe and Openwork and situated between Brunswick’s Clifton and Gilpin Parks, LIV Albert Fields will be among the first of its kind: a neighbourhood designed and built entirely for renters, that puts people at the centre of the design process.

Mirvac are working to ensure that LIV Albert Fields will make a positive contribution to the future of Brunswick, driven by a genuine commitment to sustainability, community, diversity and longevity.

Design Features

Empty heading

Flexible Renting * Artist's Impression

The design and build will focus on high-quality materials, driven by a goal to make LIV Albert Fields improve with age, provide flexibility for evolving lifestyles, and encourage lifelong connections. We want our residences to always feel like home—no matter who you are or how your life changes.

The project undertakes a place-based approach to enhance and build upon the existing social and urban fabric of the area and embraces environmentally sustainable design in its architectural response. In this vein, the proposal is purposefully aligned with key policy objectives of which encourages and supports innovation in design, technology and development processes. The design and build will focus on high-quality materials, driven by a goal to make LIV Albert Fields improve with age, provide flexibility for evolving lifestyles, and encourage lifelong connections. We want our residences to always feel like home—no matter who you are or how your life changes.

Lifestyle Included * Artist's Impression

Sustainable development principles are at the heart of this design proposal. LIV Albert Fields seeks to meet the needs of the local community through the provision of high-quality housing, which is economical, energy-efficient and functional to ensure ongoing resilience and adaptability. LIV Albert Fields incorporates key principles that align with Mirvac’s sustainability strategy ‘This Changes Everything’ making positive change an intrinsic part of what Mirvac does.

The low operational and maintenance cost of the buildings helps to facilitate long term financial affordability for residents. Additionally, the design seeks to achieve high quality indoor air and utilisation of daylight for the health and wellbeing of the residents. These sustainability initiatives will directly benefit the residents at LIV Albert Fields.

Construction Updates

Hours of site activity will be in accordance with Merri-bek City Council guidelines, as follows:

  • 7.00 am to 6.00 pm Monday to Friday (other than a Public Holiday); and
  • 7.00 am and 1.00 pm Saturday.

While works are being undertaken, there will be a certain unavoidable level of noise and disruption. The site team will work to ensure that all works will be undertaken in accordance with authority approvals. In addition, the following measures will be implemented to ensure the safety of the community and workers:

  • maintenance of site perimeter and hoarding;
  • traffic control and signage during work hours;
  • maintaining safe pedestrian access on Albert Street;
  • dust suppression; and
  • sediment control with regular street sweeping of Albert Street.

Indicative Program

Practical completion is currently expected in late 2025.

Traffic Management

All construction vehicles will have access to the site from 2 locations on Albert Street. Traffic controllers will be located on Albert Street to safely manage construction vehicle movements to ensure that there is minimal impact and safe passage to pedestrians, cyclists and general traffic.

Construction Waste

Mirvac strive to maximise the re-use and recycling of all construction materials being used and stored on site. At LIV Albert Fields, the project will aim for >95% of waste to be diverted from landfill by recycling, reusing or other methods.

Environmental Remediation

All works on site will comply with a Construction Environmental Management Plan prepared by an Environmental Engineer. This document provides relevant guidance to ensure matters arising from the condition of soils and groundwater at the site are appropriately managed during site redevelopment. Prior to the commencement of construction, the CEMP is verified by an independent Auditor that is appointed under the Environment Protection Act 1970 by the Environment Protection Authority.

Frequently Asked Questions

What is LIV?

LIV is designed and built entirely for renters. We are aiming to offer renters in Australia a new way of living that’s flexible, secure and community-focused. In Australia, housing affordability is an ongoing challenge – and at Mirvac, one of the ways we’re addressing this issue is through Build-to-Rent (BTR). While it’s a relatively new concept in Australia, the BTR model is successful in many overseas markets, and we’re excited to lead this here at home. BTR also recognises that those lifestyles are changing with many people choosing to rent. While each LIV community will be unique to their city location, they’re also united by common characteristics:

  • Secure lease terms. Renters have a choice of duration, can add parking or storage, and even agree to pet-friendly terms.
  • Rent reassurance. Annual rental increases will be capped.
  • Shared amenities. Residents have access to free fitness facilities, gardens and there are resident activities and an events program to suit everyone.
  • Sustainable living. LIV communities have a host of features to reduce emissions – from LED lighting and energy efficient appliances, to solar PV systems, water-efficient fixtures and smart waste management.
  • Handy inclusions. Maintenance services and whitegoods come as part and parcel of each lease, and residents can even opt to have internet and utility connections taken care of prior to moving in.

 

Who is developing the site?

Mirvac

How many apartments will there be?

In accordance with our approval, LIV Albert Fields will feature 498 renters-only apartments. There will be a mix of studio, 1, 2 and 3 bedroom apartments.

How many buildings will there be?

There will be two residential buildings and a north-facing community pavilion and a north-facing pavilion featuring landscaping and BBQs for public use along with a retail space.

How tall will the buildings be?

The residential buildings will range from 8 to 11 levels.

Who is designing the project?

This project will bring together some of Melbourne's most thoughtful and well-regarded architects, interior and landscape designers. Key collaborators include:

  • Fieldwork is an architecture practice that focuses on research and experimentation to deliver thoughtful projects that resonate with their surroundings.
  • Breathe is an architecture and design practice that prioritises social, economic and environmental sustainability.
  • Openwork, a landscape architecture consultancy and urban design studio that creates public spaces geared toward future living.

Who is the builder?

Mirvac Constructions (VIC) Pty Ltd

When will LIV Albert Fields be open for residents to move in?

We look forward to welcoming residents in late 2025.

Will there be any retail uses on-site?

Yes! Our approved scheme permits several retail uses on our ground floor plane. We are currently working through the best mix for these spaces and welcome any feedback or suggestions. You can reach us at liv.albertfields@livmirvac.com.

What will the community benefits be?

In line with the planning approval, we look forward to providing a landscaped public accessway from Albert Street directly to Clifton Park, creating an open and activated precinct, and providing a direct link from Gilpin Park to Clifton Park. There will also be retail offerings providing amenities for residents and locals to promote activation of spaces. LIV Albert Fields will also feature 15 Affordable Housing Dwellings. These dwellings will be offered to eligible occupiers at a discount to market rent.

Will Mirvac be engaging with the Traditional Custodians of LIV Albert Fields?

Mirvac has a vision for reconciliation which is outlined in our Reconciliation Action Plan and respectful development is one of our guiding principles, we reflect and include local Aboriginal and Torres Strait Islander histories in our projects.
The LIV Albert Fields project team has engaged with the Wurundjeri Woi-Wurrung Cultural Heritage Aboriginal Corporation to seek input into design elements and opportunities to embed Aboriginal cultural heritage through site elements including but not limited to recognition, education and support.

Through these discussions, we have learned that Brunswick was originally covered by grassy woodlands, which would have been rich hunting grounds for the Wurundjeri Woi-Wurrang people of the area. In areas surrounding Brunswick, the nearby waterways of Merri Creek and the confluence with the Yarra River at Dights Falls are significant places for the Wurundjeri Woi-Wurrang people. The nearby suburb of Fitzroy was also home to a large number of Indigenous organisations and was the birthplace of the Aboriginal Rights movement in Victoria.

It is intended that the engagement and recognition of the traditional owners of LIV Albert Fields will be ongoing for the life of the project.

Contact Us

Lorum Ipsum
0412 111 111
lorum@ipsum.com

Lorum Ipsum
0412 111 111
michael@lorum@ipsum.com